Archive for August, 2007
Posted on August 31, 2007.
Walking through the main level of the Robinson Music Library, many have noticed the absence of our media collection; CDs, DVDs, videorecordings and our CIM performance collection. All these materials have been moved to the Robinson Library’s Media Center. This is located on the lower level beneath the south side (entrance) of the library.
In [...]
Read Full Post |
Make a Comment ( None so far )
Posted on August 28, 2007.
On Monday, we officially opened our doors to the public. Come and visit. On the library’s main level, you will find our reference collection, circulating scores and books and periodical collection. The Library Media Center is located on the lower level. At this time, it accessible from a temporary entrance [...]
Read Full Post |
Make a Comment ( None so far )
Posted on August 21, 2007.
On Monday, the final part of the score collection was shelved. We were thrilled to have space remaining in most sections for future growth. This week the library staff will be busy setting up their new office spaces as well as the library as a whole.
Construction is still in progress so we [...]
Read Full Post |
Make a Comment ( None so far )
Posted on August 17, 2007.
On Thursday, we welcomed our large collection of scores back into the library (over 700 linear feet). Jimmy is following the movers integrating returned scores and those which were used for Encore.
The Media Center is looking great. The new monitors and remotes have been installed on adjustable arms. [...]
Read Full Post |
Make a Comment ( None so far )
Posted on August 15, 2007.
Today, a portion of our print collection returned. Fridrich Moving shelved our bound collections and book collection on our new shelving. We are starting to look like a library again.
Before…
After…
Before
After
Read Full Post |
Make a Comment ( None so far )
Posted on August 14, 2007.
People from Library Design began to install the shelving units on the main level.
The tables in the Library Media Center are in place. Darren of AVS is installing the wiring for the distributed media system.
Read Full Post |
Make a Comment ( None so far )
Posted on August 10, 2007.
It’s hard to believe it’s already mid-August. The library staff will be dedicating their time and energy to setting up “house” in the renovated facility over the next two weeks. The CIM staff has laid a great foundation for the work and efforts to come. Our vendors are gearing up to install our [...]
Read Full Post |
Make a Comment ( None so far )
Posted on August 2, 2007.
This past month, the library staff settled into our retrospective conversion project, even among vacations, unexpected workshops and the beautiful weather we experienced. Sarah, a graduate student, completed her tenure with us. Sarah is now very familiar with our LP record collection as she has handled almost each record as she initiated the [...]
Read Full Post |
Make a Comment ( None so far )